Completed in May of 2025, this was the first location featuring Mako’s new prototype design. The design, developed by COR3, features lighted color accent stripes along the facade creating design interest and night time marketing for the owner. The building has a 122′ tunnel which allows for future equipment expansion.
COR3 partnered with Fuller Engineering, LWI, Matrix and ADC Engineering on this project for Mako Wash Express.



